Nedcap
  Home Email Sitemap Contact
  Pioneers in
Energy Conservation & Efficiency and
    New & Renewable Power Projects
Help and advice
Give us your feedback
Manufacturers & Consultants
Solar Energy
Wind Energy
Biomass Energy
Biogas and Bio Energy
Industrial Waste to Energy
  Incentives
  Industrial Waste Based Power Projects
  Success Story
  Projects Sanctioned
  Projects Under Implementation
  Municipal Waste Power Projects
  List of Project Developers
  Controlling Officers Profile
Mini Hydel Project
 
  Success Stories  
 
 
  In our Sanctioned Projects under Municipal Solid Waste, M/s. SELCO INTERNATIONAL LTD have commissioned.  
  More  
 
 
  National Energy Labeling Programme  
 
About Us
 
Industrial Waste Based Power Projects
The Capital Subsidy for Industrial Waste based Power Projects will be considered subject to the following:
  • The amount of capital subsidy would be calculated on the basis of installed capacity
  • Total Capital Subsidy would be limited to Rs. 5.00 crore per projects.
  • Subsidy amount will be restricted to 20 % of the project cost.
  • In case of ongoing project sanctioned by the Ministry under the existing interest subsidy scheme, the promoters would be given an option to get the undisbursed CFA amount adjusted against the loan as one-time support from the Ministry after successful commissioning of the project. The total CFA amount will be equivalent to the original sanctioned interest subsidy amount, taking the appropriate discount factor used in the case of releasing the funds to IREDA / Other FIs / Banks with the provision that this should not lead to any additional outgo of funds form the Ministry.
  • The projects already agreed to ‘in principal’ by the Ministry , but could not be sanctioned so far, would be considered on merit under the programme.
Capital Subsidy to the Promoters:
Wastes / Processes /Technologies Capital Subsidy
  1. Industrial Waste to Biogas
    1. Biomethanation of low energy density and difficult industrial Wastes (i.e. dairy, tannery, Slaughter house, Sugar(liquid), bagasse wash, textile (liquid), paper (liquid) and pharmaceutical industry).
    2. Biomethanation of other industrial Wastes.
  2. Power Generation from Biogas
    1. Boiler + Steam Turbine Configuration
    2. Biogas Engine /Turbine     
      Configuration
  3. Power Generation from Solid Industrial Waste (Boiler +Steam    Turbine Configuration)
Rs.1.0 crore / MWeq. (12000 Cu.M. biogas per day)
Rs.0.50 crore/MWeq.(12000 Cu.M. biogas per day)
Rs.0.80 crore/MW
Rs.1.00 crore/MW
Rs.0.80 crore/MW
 
Do you have any comments or feedback about our website?
  About Us Notifications Downloads
Powerd by FOVEA TECHNOLOGIES All rights reserved Nedcap.gov.in.